Police Department

Cape Girardeau, MO 63702

Strickland Engineering was the prime consultant for the complete renovation and modification of the existing 2 story building’s HVAC systems. The facility included office areas, conference/training room, 911 call center, jail, holding/booking areas, garage, locker room, filing/storage areas, and evidence rooms. The existing multi-zone systems were replaced with custom multi-zone equipment and the existing ductwork systems were modified to reflect the current use of the building spaces. The system design also included the installation of a new computerized temperature control system and the coordination of the installation to keep the existing facility in operation during the project.

Client: Cape Girardeau, City of